H100-SXM5Hopper
NVIDIA H100 SXM5
Training and serving on 8-GPU HGX nodes, single node or multi-node over InfiniBand.
HBM3 per GPU
80 GB
NVIDIA reference figure
- 1. SXM5 module · 8 per baseboard, in a 2 × 4 grid
- 2. Heatsink · one per module; this one is drawn lifted
- 3. H100 GPU · one per module, under the heatsink
- 4. NVSwitch chip · 4 per baseboard, grouped at one end
- 5. Baseboard · joins the 8 GPUs in one NVLink domain
Point at a part or a row. The other one lights.
H100 SXM5 specifications.
| Parameter | Value | Scope | Source |
|---|---|---|---|
| Memory | |||
| Memory | 80 GB HBM3 | Per GPU | [1] |
| Memory bandwidth | 3.35 TB/s | Per GPU | [1] |
| Memory on one board | 640 GB · 8 × 80 GB | Per HGX board | [1] |
| Compute, peak · dense / sparse | |||
| FP4 Tensor Core | Not supported on Hopper | Per GPU | |
| FP8 Tensor Core | 1,979 / 3,958 TFLOPS | Per GPU | [2] |
| BF16 Tensor Core | 989 / 1,979 TFLOPS | Per GPU | [2] |
| Interconnect | |||
| NVLink 4 | 900 GB/s (18 links) | Per GPU | [3] |
| NVLink domain | 8 GPUs per HGX H100 board | Per HGX board | [4] |
| Host interface | PCIe Gen5 x16 · 128 GB/s | Per GPU | [1] |
| Power and form factor | |||
| Power | Up to 700 W, configurable | Per GPU | [1] |
| Form factor | SXM5 module on the HGX H100 baseboard | [1] | |
| Board | 8 GPUs per HGX H100 board · 4 NVSwitch chips (third generation) | Per HGX board | [4] |
Specifications are NVIDIA reference figures.
Best for
- Training and fine-tuning
- Inference
- HPC (FP64 34 TFLOPS, FP64 Tensor 67 TFLOPS)
Notes on the figures
- FP4: not supported on Hopper.
- FP8 and BF16: NVIDIA datasheet footnote, "Shown with sparsity. Specifications 1/2 lower without sparsity."
On-demand, spot or reserved.
Metered by the second, billed hourly. Reserved rates are quoted per term.
-
On-demand
$5.40 /GPU·hr
- Per GPU-second
- $0.001500
- Per 8 GPUs, per hour
- $43.20
- Per GPU-month, 730 h
- $3,942.00
Preview list price. It applies when your account opens.
-
Spot
From $0.87 /GPU·hr
Work that checkpoints and can wait. Follow the current spot price, or set a maximum hourly price. If the spot price rises above your max, the workload may stop.
"From" is the lowest spot price for that GPU. The spot price moves with supply and demand. The spot price always stays below the on-demand rate for the same GPU.
Spot price moves with supply and demand. Follow it, or set a max price per GPU-hour: you pay the spot price, and nodes stop if it rises above your max. A max price limits what you pay. It does not reserve capacity. To guarantee capacity, reserve it. How spot works
-
Reserved
Request a quote
Capacity you need on a date, guaranteed. 1 month, 6 months or 12+ months.
Ways to pay Prepaid credit, pay-as-you-go and Enterprise. Each one covers on-demand, spot and reserved capacity. How billing works
| Term | Commitment | Capacity | Rate |
|---|---|---|---|
| On-demandNone · Not held | None | Not held | $10.45 /GPU·hr |
| 1 monthTake-or-pay · Held for the term, on one fabric | Take-or-pay | Held for the term, on one fabric | Request a quote |
| 6 monthsTake-or-pay · Held for the term, on one fabric | Take-or-pay | Held for the term, on one fabric | Request a quote |
| 12+ monthsTake-or-pay · Held for the term, on one fabric | Take-or-pay | Held for the term, on one fabric | Request a quote |
| Term | Commitment | Capacity | Rate |
|---|---|---|---|
| On-demandNone · Not held | None | Not held | $9.35 /GPU·hr |
| 1 monthTake-or-pay · Held for the term, on one fabric | Take-or-pay | Held for the term, on one fabric | Request a quote |
| 6 monthsTake-or-pay · Held for the term, on one fabric | Take-or-pay | Held for the term, on one fabric | Request a quote |
| 12+ monthsTake-or-pay · Held for the term, on one fabric | Take-or-pay | Held for the term, on one fabric | Request a quote |
| Term | Commitment | Capacity | Rate |
|---|---|---|---|
| On-demandNone · Not held | None | Not held | $5.94 /GPU·hr |
| 1 monthTake-or-pay · Held for the term, on one fabric | Take-or-pay | Held for the term, on one fabric | Request a quote |
| 6 monthsTake-or-pay · Held for the term, on one fabric | Take-or-pay | Held for the term, on one fabric | Request a quote |
| 12+ monthsTake-or-pay · Held for the term, on one fabric | Take-or-pay | Held for the term, on one fabric | Request a quote |
| Term | Commitment | Capacity | Rate |
|---|---|---|---|
| On-demandNone · Not held | None | Not held | $5.40 /GPU·hr |
| 1 monthTake-or-pay · Held for the term, on one fabric | Take-or-pay | Held for the term, on one fabric | Request a quote |
| 6 monthsTake-or-pay · Held for the term, on one fabric | Take-or-pay | Held for the term, on one fabric | Request a quote |
| 12+ monthsTake-or-pay · Held for the term, on one fabric | Take-or-pay | Held for the term, on one fabric | Request a quote |
| Term | Commitment | Capacity | Rate |
|---|---|---|---|
| On-demandNone · Not held | None | Not held | $2.16 /GPU·hr |
| 1 monthTake-or-pay · Held for the term | Take-or-pay | Held for the term | Request a quote |
| 6 monthsTake-or-pay · Held for the term | Take-or-pay | Held for the term | Request a quote |
| 12+ monthsTake-or-pay · Held for the term | Take-or-pay | Held for the term | Request a quote |
| Term | Commitment | Capacity | Rate |
|---|---|---|---|
| On-demandNone · Not held | None | Not held | $1.86 /GPU·hr |
| 1 monthTake-or-pay · Held for the term | Take-or-pay | Held for the term | Request a quote |
| 6 monthsTake-or-pay · Held for the term | Take-or-pay | Held for the term | Request a quote |
| 12+ monthsTake-or-pay · Held for the term | Take-or-pay | Held for the term | Request a quote |
List price for the base shape: 1 GPU, 8 vCPU, 32 GiB. Larger shapes are quoted.
Reserved rates are quoted per term. Reservations are tied to a GPU type, a region and one InfiniBand fabric. Take-or-pay under a signed order form. No early cancellation without penalty (Terms §3).
Runs as instances and as cluster nodes.
HGX H100: 8 GPUs, 4 third-generation NVSwitch chips, 640 GB of HBM3 per node.
H100 runs as a 1-GPU instance (16 vCPU · 200 GiB) or as an 8-GPU node (128 vCPU · 1,600 GiB). 8-GPU nodes join one InfiniBand fabric at 400 Gb/s per GPU, 3.2 Tb/s per node. Host network adapter: 100 Gb/s per machine. Connections: 8 GPUs to One InfiniBand fabric, 8 links: 8 × 400 Gb/s; More 8-GPU nodes to One InfiniBand fabric; 1 GPU to Host network adapter.
- vCPU
- 16
- RAM
- 200 GiB
1 GPU- rating
- 100 Gb/s
- scope
- per machine
- vCPU
- 128
- RAM
- 1,600 GiB
- CPU
- Intel Xeon Platinum
- 8468
8 GPUs · NVLink 4- per GPU
- 400 Gb/s
- per node
- 3.2 Tb/s
Every node of one cluster sits on the same fabric. A cluster is placed onone fabric and stays there.
- vCPU
- 16
- RAM
- 200 GiB
1 GPU- rating
- 100 Gb/s
- scope
- per machine
- vCPU
- 128
- RAM
- 1,600 GiB
- CPU
- Intel Xeon
- Platinum 8468
8 GPUs · NVLink 4- per GPU
- 400 Gb/s
- per node
- 3.2 Tb/s
- vCPU
- 16
- RAM
- 200 GiB
1 GPU- rating
- 100 Gb/s
- scope
- per machine
- vCPU
- 128
- RAM
- 1,600 GiB
- CPU
- Intel Xeon Platinum 8468
8 GPUs · NVLink 4- per GPU
- 400 Gb/s
- per node
- 3.2 Tb/s
H100 SXM5 listing.
CPU, RAM, local NVMe and the fabric vary by pool and are reported at placement. GPUs and InfiniBand adapters are passed through whole to one machine.
- Status
- Private Preview
- Runs as
- Single instances and GPU Clusters
- Capacity
- On-demand · Spot · Reserved
- Metering
- Metered by the second, billed hourly
| Parameter | Value | Scope |
|---|---|---|
| 1 GPU | 16 vCPU · 200 GiB | Per machine |
| 8 GPUs | 128 vCPU · 1,600 GiB | Per machine |
| Host CPU | Intel Xeon Platinum 8468 | Per 8-GPU node |
| InfiniBand | 400 Gb/s | Per GPU |
| InfiniBand | 3.2 Tb/s | Per 8-GPU node |
| Host network adapter | 100 Gb/s | Per machine |
NVIDIA H100 SXM5 on Fantasti: fantasti.ai/gpus/h100-sxm5 · Request capacity: fantasti.ai/contact
- Sheet
- 01 / 01
- Title
- H100 SXM5 datasheet
- Figures
- NVIDIA reference
- Reviewed
- 2026-10-10
Request H100 SXM5 capacity.
Tell us the count, the term and where it should run. We reply to a reviewed request, usually within one business day. A reserved term is quoted.